DOI: 10.7672 / sgjs2024100073
Combined with a new mining tunnel in Beijing underpassing existing operating tunnels withdifferent structural forms, based on the Peck theory correction formula and the measured deformationdata, the fitting analysis method is used to fit the inversion analysis, and the deformation characteristicsof the new tunnel under different structural forms of the existing operating tunnel are studied andanalyzed. The results show that the structural deformation of the existing tunnel caused by theconstruction of the new tunnel is related to the structural form of the existing tunnel, and the variation lawof vertical displacement is shield tunnel > mining method > mine arch tunnel. The upper step of newtunnel has great influences on the existing tunnel, single-line crossing presents a single slot, whiledouble-line crossing presents a double slot, the two crossings have superimposed effects. Peck theorycorrection formula can fit the settlement of existing tunnels with different structural forms caused by theconstruction of new tunnels, the ground loss rate of the existing tunnel structure is 0.018% ~ 0.079%,which is at a lower level in the range of natural stratum values. The width parameter of the settlementtrough is 0.77 ~ 1.70, which is greater than the natural stratum value. By comparing the fittingparameters of the cumulative settlement curve of the existing tunnels with different structural forms, it canbe found that the loss rate of the existing tunnel stratum during the crossing construction is inverselyrelated to the stiffness of the existing tunnel structure, and the width parameter of the settlement trough ispositively related to the stiffness of the existing tunnel structure.